Supply and installation of biogas covers
Genap supplied and installed 21-metre biogas covers for two new concrete silos at the sewage treatment works in Venlo. Both covers consist of two layers of reinforced PVC membranes that are secured to the concrete wall of the silos. An airblower ensures the continuous convex shape of the cover.
“Quality, customer-focus and innovation: these are the core values that we have experienced with Genap for many decades and which regularly converge in projects such as the Lagoon at the Dolfinarium, the Ubbena landfill site and the top covers for the digesters at the RWZI (sewage treatment works) in Venlo.”
Michel Dijk, Group Director, GMB
|
Genap ist WHG-zertifiziert |